Skip to main content

Work

Systems that run every single day

We don’t show mock-ups. These are projects in production, with the numbers they produced.

01 Groupe Vertane

Taking back control of an infrastructure on its last legs

Fourteen servers inherited from three successive suppliers, no backup tested in two years, and response times that were dragging production down. We took the lot on, migrated what could be migrated and removed the rest.

  • Infrastructure
  • Monitoring
  • Cloud

Results

÷4
Response times
99.98%
Uptime over 12 months
−38%
Hosting costs
Sector
Manufacturing
Year
2025
Duration
6 weeks
02 Atelier Bergevin

A cloud migration without a minute of downtime

A twelve-year-old in-house ERP, hosted in a cupboard, to be moved to the cloud without stopping a business that ships six days a week. Cutover on a Friday evening, with a way back at every step.

  • Cloud & DevOps
  • Infrastructure
  • Maintenance

Results

0 min
Downtime
×3
Processing speed
12 years
Of code taken on
Sector
Wholesale
Year
2025
Duration
4 months
03 Distribution Lachance

An ordering platform that replaces 40 spreadsheets

A hundred and twenty sales reps were placing orders by email and spreadsheet. We built a single portal, wired into their ERP, usable from a phone at the back of a warehouse with no signal.

  • Development
  • APIs & integrations
  • Maintenance

Results

−72%
Data entry errors
120
Daily users
2 min
Per order, down from 15
Sector
Distribution
Year
2024
Duration
7 months
04 Assurances Verchères

A security audit ahead of certification

A full audit — application, infrastructure and organization — a few months out from certification. Two critical flaws found, one of them exposed since 2019, both fixed before the engagement ended.

  • Cybersecurity
  • Audit
  • Law 25 compliance

Results

2
Critical flaws closed
31
Fixes delivered
100%
Certification achieved
Sector
Insurance
Year
2024
Duration
5 weeks
05 Néori Logistique

Real-time fleet tracking, from the truck to the dashboard

Three hundred vehicles, on-board units reporting their position every ten seconds, and a leadership team that finally wanted to know where its deliveries had got to. A mobile app for the drivers, a control view for head office.

  • Development
  • Mobile
  • Infrastructure

Results

300
Vehicles tracked
10s
Position freshness
+18%
On-time deliveries
Sector
Transport
Year
2024
Duration
9 months
06 Ville de Rivière-aux-Ormes

A citizen portal everybody can use

Online services for twenty-two thousand residents, with one non-negotiable constraint: the portal had to work for a blind person, on an old phone, over a poor connection. WCAG 2.1 AA compliance confirmed by an external audit.

  • Development
  • Accessibility
  • Maintenance

Results

WCAG
AA compliance confirmed
22,000
Residents served
1.1s
Load time on 3G
Sector
Public sector
Year
2023
Duration
5 months

Let’s talk

Got a project in mind? Start with a conversation.

Tell us about your situation in a few lines. We’ll come back within 24 business hours with an honest opinion — and if it isn’t one for us, we’ll say so.